← All projects
Session Handoff · Virtual Restyle

Session Handoff — Virtual Restyle: Phases 2+3 full build + structure-check fix (code complete, verified, not deployed)

Saved 2026-07-04

Paste it into a fresh Claude Code session and say “resume from this handoff.” It's briefing only — Claude will wait for your next instruction.

Session Handoff — Virtual Restyle: Phases 2+3 full build + structure-check fix (code complete, verified, not deployed)

Where it started

Sondra pasted the Phase 1 handoff (re-home off Lovable, done + verified) and said: keep moving, build EVERYTHING per FABLE-BUILD-PROMPT.md without stopping at every little thing, hold the Cloudflare deploy (deploy when there's more to show), and never touch her original repo/main. Mid-session she hands-on tested and reported two issues: first-pass staging altered the room structure (removed a bay window), and the landing page mentioned "Pro" only in an orphan footnote. Both fixed same session.

Decisions locked + what shipped

Key files for next session

Running state

Verification — how to confirm things still work

Deferred + open questions

Pick up here

Wait for Sondra's re-test verdict (structure check is now live at localhost:8080), then the next real step is the Phase 0 distribution test — draft the agent-group post in her voice on her go; code work only resumes if her testing surfaces issues.

LAUNCH ADDENDUM (2026-07-04 evening) — LIVE at https://virtualrestyle.com

Sondra's go: "put my domain on it, everything working." Shipped same session, commit 67814e6 on relaunch-v2:

Generated for the CEO Dashboard · source: PROJECTS/Virtual Restyle/handoffs/virtual-restyle-phase2-3-structure-check-2026-07-04.md 🤍